RIBA Plan of Work Explained: Stages 0 to 7 in Plain English

The RIBA Plan of Work is the UK's standard framework for organising a building project, from the first conversation through to years after you've moved in. It sets out eight stages, numbered 0 to 7, each with its own purpose and outcome, as a shared structure the industry works to rather than a fixed menu that every project must follow in full. RIBA itself distinguishes the framework from the detailed professional services, responsibilities and deliverables agreed in your actual appointment, which is a separate document. Architects refer to the stages constantly, which can make early conversations feel more technical than they need to. This guide explains what each stage actually means and how we work through it with our clients.

Stage

Main Purpose

A Client Decision at This Stage

0: Strategic Definition

Establish the best way to meet your requirements

Confirming the initial scope and appointment

1: Preparation and Briefing

Turn requirements into a proper project brief

Agreeing the brief, budget and programme

2: Concept Design

Develop and test initial design ideas

Approving a concept to take forward

3: Spatial Coordination

Coordinate architecture, structure and services

Reviewing the design before planning submission

4: Technical Design

Produce detailed technical information

Reviewing specifications before tender

5: Manufacturing and Construction

Build what's been designed

Approving variations that arise on site

6: Handover

Complete, inspect and hand over the building

Signing off completion and the defects process

7: Use

Review performance once the building is in use

Deciding whether to commission a post-occupancy review

Why the Framework Matters

Following a recognised structure, rather than an ad hoc process, gives a project four practical benefits:

  • Clarity. Everyone involved, from you to contractors to consultants, knows what's happening and why at any given point.

  • Consistency. The same standards and checks apply at every stage, which reduces the chance of something being missed.

  • Collaboration. Architects, engineers and contractors share a common structure and language, which makes coordination easier on anything beyond the simplest project.

  • Cost control. Because costs are reviewed and refined at each stage rather than fixed once at the start, you get a clearer picture of budget as the design develops, not a single early estimate that drifts.

The stages apply to projects of any size, though a smaller residential project often moves through some of them more quickly than a large commercial scheme would.

Two tan lounge chairs face a low oval coffee table in a sitting room with tall windows and a branching ceiling light.

Stage 0: Strategic Definition

This is the stage before any design work begins. Its purpose is to establish the best way to meet your requirements in the first place, including whether building work is actually the right solution at all, rather than, say, reorganising how you already use your space. More detailed feasibility and site-specific assessment follow in Stage 1.

At Doll & Co., this usually takes the form of an initial conversation and, where useful, a site visit. We discuss your aims and the initial scope, then explain the proposed appointment and fees before further work is commissioned.

Stage 1: Preparation and Briefing

Once a project looks viable, this stage turns that initial conversation into a proper project brief: your requirements, your budget, a realistic programme, and the site information needed to design against.

We'll arrange any surveys your property needs, such as a measured survey, and where it's useful, seek informal pre-application planning advice from the local authority before committing to a design direction. For listed buildings or properties in a conservation area, this is also where we start identifying what a heritage statement will need to address later on.

Stage 2: Concept Design

This is where design work properly begins. Using the brief from Stage 1, we develop initial architectural concepts, test them against your budget, and refine them with you through design reviews.

For a period property, this stage is also where we start working out how a new layout, more daylight or updated services can sit alongside original proportions and features, rather than fighting against them.

A typical London refurbishment shows how these threads connect. A measured survey from Stage 1 reveals the original room proportions and any structural quirks; a heritage assessment, where the property is listed or in a conservation area, identifies which features need protecting; and the concept design has to resolve both of those against the layout and daylight the client actually wants, before any of it gets tested against structure and services at Stage 3.

Stage 3: Spatial Coordination

The concept from Stage 2 gets resolved into a properly coordinated design here: structural approach, services, and architectural layout all considered together rather than separately. For most residential projects, this is also the stage at which the planning application is prepared and submitted.

We coordinate with any structural engineer or other consultant the project needs, and manage the planning application process directly, including liaising with planning officers on anything that comes up during determination.

Stage 4: Technical Design

Once a design is settled, Stage 4 produces the coordinated technical information needed for manufacture and construction: detailed drawings, specifications, structural and services design, and the information required to demonstrate Building Regulations compliance. In practice this often involves two layers of detail: what's needed for statutory approval, and the further specification, such as materials, joinery and finishes, needed to tender the project accurately and control quality on site.

Technical design and construction aren't always strictly sequential. Depending on how a project is procured, work can start on site before every element of the technical design is finalised, with some specialist design continuing alongside early construction. Regardless of how that timing works out, we'll assemble a tender pack so that contractors are pricing the same clearly defined scope rather than quoting against a vague brief.

Stage 5: Manufacturing and Construction

This stage covers manufacture, construction and commissioning: the design becomes a physical building. Responsibility for the build itself sits with your contractor. Where inspections and contract administration are included in our appointment, we visit site at agreed intervals, respond to queries that arise during construction, and check that what's being built matches the design intent, though this isn't the same as continuous supervision of the works.

Stage 6: Handover

This stage covers the final part of construction and the period immediately after: final inspections, resolving snagging, formally handing the building over, and closing out the building contract. It also includes the defects period that typically follows practical completion, commonly six to twelve months, during which any defects attributable to the contracted work are addressed under the terms of the building contract, rather than as an open-ended ongoing obligation.

Stage 7: Use

Stage 7 begins alongside Stage 6 and continues for as long as the building is in use, rather than starting only once Stage 6 ends. Good practice includes a post-occupancy review some months after moving in, checking that the design is performing as intended and picking up anything worth addressing. What we learn from completed projects genuinely informs how we approach the next one.

Frequently Asked Questions

Do I need to go through every RIBA stage for a smaller project? The framework still applies, but the stages don't need equal time or formality. On a domestic extension or refurbishment, Stages 0 and 1 are often combined into a single initial phase. The scale of information needed at each stage is proportionate to the size of the project, though the relevant Building Regulations and other compliance requirements still apply in full regardless of scale.

At which stage do I apply for planning permission? Most residential projects submit a planning application toward the end of Stage 3, once the design is spatially coordinated, though pre-application advice is often sought earlier, during Stage 1, to reduce risk before the design is finalised.

Can I appoint an architect partway through, for example just for Stage 4 onward? Yes, in principle, though it's less common and can mean re-doing some earlier work to properly understand the design intent behind it. Appointing one practice across the earlier stages avoids that gap, where that's how a particular project is structured.

How long does the whole process typically take? It varies enormously by project size and complexity, and by how long planning determination takes for your specific scheme. As a general shape, the pre-construction stages (0 to 4) on a typical residential project often take several months to a year, with construction itself (Stage 5) adding a further few months to a year depending on scope.

Does the Plan of Work cover interior design as well as architecture? RIBA describes the Plan of Work as a framework for all disciplines involved in a construction project, not one written only for architects. Where architecture and interior design are both part of our appointment, we coordinate them through the same stages rather than running two separate timelines.

How We Work Through the RIBA Stages

  • Coordinated appointments. Where architecture and interior design are both included in your appointment, we coordinate them through the relevant project stages rather than running them as two separate timelines.

  • RIBA Chartered. We hold ourselves to the standards the institute sets for practising architects.

  • Honest feasibility. If Stage 0 suggests your brief and your property don't yet line up, we'll tell you plainly before moving further.

See our full Architectural Services page for more on how this process runs in practice, and our piece on what extension architecture actually involves for a related look at the design process specifically.

Speak to Us About Your Project

Wherever you are in your thinking, whether you haven't yet had a Stage 0 conversation or you're partway through a project with another practice, we'd be glad to talk through what the RIBA stages mean for your specific property.

Book an initial consultation

Disclaimer: The information provided on this page is for general guidance only. Timelines, statutory processes and the precise scope of each stage vary by project and location, and should be confirmed on an individual basis following a formal consultation.

Sources

Author